How can you reduce costs in your company? Start with what is invisible at first glance.

In the meeting, you see that production was once again more expensive than you expected. The shift supervisor talks about problems on the line, but by the time the production records are collected and the reports are prepared, another week is already underway. You may have adjusted the plan or looked for better-value suppliers, yet the same problem keeps coming back. How can you reduce costs in your company when you only get to the causes after a delay? You can start with the information that is generated in your operation every day but does not yet reach the people who can act on it in time.

Ako znížiť náklady vo firme? Začnite tým, čo je na prvý pohľad neviditeľné. | How can you reduce costs in your business? Start with what you don’t see at first glance.

Why doesn’t a cost overview show where waste occurs?

From the monthly overview, you find out that you produced fewer units, used more material or paid more for energy. The cause, however, remains hidden and with it the opportunities to reduce costs. Behind a missed plan, there may be a series of short stops that nobody remembers exactly by the end of the shift. Higher material consumption, in turn, may have been caused by an error during machine setup. And a higher energy bill may be the result of equipment running unnecessarily at times when nothing is being produced.

The information needed to uncover these causes often already exists in the company. Part of it is in the machines, part on paper and another part in a separate record-keeping system. However, if someone first has to find it and put it together, identifying the cause takes too long, and in the meantime the same error may keep repeating again and again. This is exactly where digitalization makes it possible to continuously collect, connect and make this data available where decisions about operations are made. Management and employees thus get a basis for reducing company costs before the problem gets worse.

How to reduce costs in a company using production data?

When the same data passes through several hands

An operator writes down the number of units produced on paper. Another employee transfers it into Excel and later into the company system. The same data thus passes through several people, and an error can occur with every transcription. If the numbers don’t match, someone has to find out where the mistake happened. Moreover, by the time a report is prepared from the data, the situation in production may already be completely different. The shift supervisor then has to find out retrospectively why the line is falling behind plan, instead of solving the problem when it occurred.

Digitalization makes it possible to simplify this entire process. SCADA can collect a large part of the data directly from the machines. Employees can then add further information via a simple electronic form. Once connected to the company system, the data is automatically transferred to where it is needed and displayed in clear reports. Employees therefore spend less time transcribing and checking spreadsheets. At the same time, the shift supervisor has a continuous overview of production and can respond to a problem much sooner.

Short stops that add up during a shift

Everyone notices a longer breakdown. However, production is also slowed down by smaller problems, such as a repeatedly jamming feeder, waiting for material or a full output buffer. Each time, the line starts up again and attention shifts elsewhere. At the end of the shift, however, finished units are missing and the records do not show where the production time was lost. And if the missing output is then made up with overtime, these inconspicuous downtimes also increase labor costs.

MES can be used to track downtime. It can automatically record when the line stopped, how long it was down and for what reason. Some reasons can be identified directly from the equipment status, while the operator adds others via a simple form. Management can thus determine which recurring problems cost production the most time and focus cost reduction measures specifically on them. In subsequent shifts, it can then monitor whether the intervention helped and whether downtime has actually been reduced.

Even units produced do not necessarily mean the plan has been met

A line can run for the entire shift and even produce the planned number of units. However, if some of them fail inspection, the company has to spend additional time on rework or produce replacements. This increases the cost of each conforming product. That is why, when evaluating production, it pays to combine data on downtime, speed and quality into a single whole. And this is exactly what OEE, the Overall Equipment Effectiveness indicator, is used for. It answers three questions together:

  • Availability: How much of the planned production time did the equipment actually run?
  • Performance: How fast did the equipment produce compared to the ideal rate?
  • Quality: What share of the units produced were good the first time?

However, measuring OEE on its own is not enough to reduce costs in a company. To do that, losses need to be broken down in more detail. The Six Big Losses model helps with this. For availability, it distinguishes between equipment failures and setups and adjustments. For performance, it tracks small stops and reduced speed. For quality, it separates defective units during startup from defects during stable production. For each type of loss, the team then looks for a measure that can eliminate it completely or at least reduce it. And after implementing it, the team monitors whether the loss has actually decreased.

Reactive maintenance can cost production dearly

A machine breaks down in the middle of an ongoing order. Maintenance scrambles for a spare part and service while production waits. On top of the repair cost come express shipping, an urgent call-out and the cost of catching up on the delay. This is how reactive maintenance works – the problem is only addressed once the equipment fails. In contrast, preventive maintenance aims to prevent breakdowns through regular inspections and servicing, for example after a certain number of operating hours. The company can thus prepare staff, parts and the shutdown in advance.

Predictive maintenance goes even further. Based on measured values, their trends and available history, it aims to estimate the future condition of the equipment and the time when intervention will be needed. The goal is to make full use of the service life of parts without unnecessarily early replacements, while intervening before their wear causes a breakdown. And if the data indicates that intervention is needed, maintenance can order parts in advance and agree on a suitable shutdown time with production. Timely intervention can also prevent damage to other parts of the machine and a more expensive repair.

Energy is consumed even when nothing is being produced

Production ends on Friday, but the heating and ventilation in the hall run all weekend as if it were a working day. The company thus also pays for equipment operation that does not match the actual use of the hall. However, the total invoice does not show where the unnecessary consumption occurs. Nor does the monthly meter reading show when consumption was elevated and how long it lasted. For more detailed monitoring of energy consumption, however, an EMS can be used. It makes it possible to display consumption over time and alert you to unusual consumption.

A BMS, in turn, is used to control heating, ventilation and lighting. If it turns out, for example, that equipment is running according to an old production schedule, its time program can be adjusted to the current use of the hall. At the same time, it helps maintain the conditions required for materials, technologies and people. Measurement via the EMS thus helps uncover unnecessary consumption, and adjusting the settings in the BMS can limit it. Further measurements will then show whether reducing energy costs was actually effective.

How to start with digitalization that brings cost reduction?

If you want to know how to reduce costs in your company, start with a specific problem that keeps recurring in production and costs you time or money. It may be time-consuming manual data transcription, frequent stops on one line or high energy consumption outside production hours. A clearly defined problem will then help you determine what data you need and what the solution should deliver. If there are several problems, give priority to the one that has a significant impact on production, can be addressed within a manageable scope and whose results you can verify relatively quickly.

Once the problem is defined, first check what data you already have available. You may get some of it from the machine’s control system, and more from existing meters or company systems. Elsewhere, you will need to add a sensor or a simple operator input. For existing data, also check its completeness and reliability so that decisions are not based on inaccurate records. The choice of technology, however, should only follow from what you need to find out and how you will act on the information obtained.

Test the solution first in a pilot project, meaning on one line or in a selected part of the operation. Involve the people who will use it in the preparation as well. The operator will help describe typical situations at the machine, maintenance will assess the available signals and the production manager will determine what information they need for decision-making. Also agree on who will review each alert and who will ensure corrective action. During the pilot, also verify whether operators can handle data entry during their normal work and understand the information displayed.

Before launch, define how you will evaluate the results. For administration, this may be the time spent preparing reports, for downtime the time lost waiting for material, and for energy the consumption outside production shifts. Record the baseline before implementing the solution so that you have something to compare the results with. Make sure to compare similar conditions. Once the cost reduction is confirmed in practice, you have a concrete basis for expanding the solution to other parts of the company.

Let’s find cost reduction opportunities in your operation too

Every operation has its weak spots. What matters is knowing which ones cost you the most and what needs to change so that the same losses do not repeat. This is exactly what we at IoT Industries can help you with. We will look at the problems you are dealing with, at your technologies and the data you already have available. We will propose how to use and connect them so that you can intervene in time and evaluate the results. We can start with one line or a specific problem and build the next steps on what proves effective in your production.

Book a no-obligation consultation and we will look at where to find specific cost reduction opportunities in your company.

Why Choose IoT/IIoT Implementation with IoT Industries?

Traditional companies typically specialize in OT (operational technologies, such as production lines and devices) or classic enterprise IT systems. However, we are able to connect both of these worlds. Our unique expertise in integrating OT and IT allows us to deliver innovative solutions in digital transformation, enhancing efficiency, reliability, and competitiveness for manufacturing companies.

Comments are closed.